Home / Blog Center / Chargers / Order of Operations: Do You Install Ceiling or Cabinets First?

Order of Operations: Do You Install Ceiling or Cabinets First?

07/08/2025 | OtterOasis

Redesigning the kitchen is one of the zones that requires the most consideration, however numerous property holders still center fundamentally on the living room range. The plan of the kitchen includes numerous viewpoints, counting plumbing, cabinetry, and electrical frameworks; if indeed one portion has issues, it can influence our future utilize. So, which ought to be done to begin with: the ceiling or the upper cabinets?

Who does the ceiling and upper cabinets first:

For the redesign of the upper space in the kitchen, the rectify strategy is to introduce the ceiling to begin with and at that point the upper cabinets. This is since there will be debilitate channels, electric wires, and water channels running through the ceiling, which are considered covered up establishments and require to be prioritized. If that’s not done to begin with, introducing the smoke conduit may require portion of the ceiling to be destroyed, which is inconvenient.

Steps for kitchen construction:

1. After selecting the extend hood, when entering the redesign stage of the kitchen, have the provider provide the run hood to the location. The to begin with step is to take out the smoke conduit, and let experts settle and introduce it. If a gas water radiator is to be introduced, it can moreover be arranged in progress at this time.

2. If the kitchen light is recessed, it is vital to introduce the installations at the development location whereas introducing the ceiling. This permits the ceiling establishment laborers to degree the measure of the installations for the boring process.

3. Once all establishments related to the ceiling are prepared, the real establishment of the ceiling can authoritatively begin.

4. The following step is to introduce the cabinets and upper cabinets, taken after by the extend hood. There is too a few talk about approximately the arrangement of these establishments, as it depends on the sort of run hood being installed—whether it is set underneath or in the center of the upper cabinets. Subsequently, the best approach is to have both parties display for concurrent installation.

In summary:The over is all the substance with respect to whether to introduce the ceiling or the upper cabinets to begin with. I trust this makes a difference everybody. For more related information, it would be ideal if you proceed to take after our site for more energizing substance in the future.